Siemens Electromotors

Posunout dolů
PROJECT TITLE:

Lighting and shading control in an administrative building

LOCATION:

Mohelnice, ČR

CATEGORY:

Industial Lighting Control WEBserver

REALIZATION:

2016 - 2021

PRODUCTS:

WEBserver-100, Vizualizace, Plánovač, Reportér, Energetický monitoring

Project info:

The first stage of the reconstruction took place in 9 halls in 2016. Part of the lighting replacement has been the implementation of a control system with 4,500 luminaires, which have a common visualization, energy monitoring and event scheduler on the central WEBserver. At present, 16 buildings, mainly production and warehouse halls, are connected to the central WEBserver in this locality. The other 3 sites of a smaller extent are solved in a similar way. The largest WEBserver monitors 83 DALI routers and almost 7,000 luminaires.

Project info:

The big advantage is the variability of time schedules, which are available to individual masters through an intuitive web interface. A detailed overview of the energy consumption of individual groups and, last but not least, a comprehensive visualization, thanks to which all halls are clearly under control in one place with the possibility of connecting other halls in the future. In each hall, the lighting control system generates great savings thanks to the regulation of the luminaires by the contribution of daylight.

CONTACTS

Do you have a question? We will
be glad to provide advice or help

Connect with us